Lin, Junyi, Naim, M.M., Spiegler, V.L.M. (2019) Delivery time dynamics in an assemble-to-order inventory and order based production control system. International Journal of Production Economics, 223 . Article Number 107531. ISSN 0925-5273. (doi:10.1016/j.ijpe.2019.107531) (KAR id:77778)
PDF
Author's Accepted Manuscript
Language: English
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
|
|
Download this file (PDF/2MB) |
Preview |
Request a format suitable for use with assistive technology e.g. a screenreader | |
XML Word Processing Document (DOCX)
Author's Accepted Manuscript
Language: English Restricted to Repository staff only |
|
Contact us about this Publication
|
|
Official URL: https://doi.org/10.1016/j.ijpe.2019.107531 |
Abstract
System dynamics play a critical role in influencing supply chain performance. However, the dynamic property of the assemble-to-order (ATO) system remain unexplored. Based on control theory, the inventory and order based production control system (IOBPCS) family, can be utilized as a base framework for assessing system dynamics. However, the underlying assumption in traditional IOBPCS-based analytical studies is that the system is linear and the delivery time to end customers is negligible or backlog is used as a surrogate indicator. Our aim is to incorporate customer delivery lead-time variance as the third assessment measure alongside capacity availability and inventory variance as part of the so-called ‘performance triangle’– capacity at the supplier, the customer order decoupling point (CODP) inventory and the delivery lead-time. Using the ‘performance triangle’ and adopting non-linear control engineering techniques, we assess the dynamic behaviour of an ATO system in the electronics sector. We benchmark the ATO system dynamics model against the IOBPCS family. We exploit frequency response analysis to ensure a robust system design by considering three measures of the ‘performance triangle’. The findings suggest delivery LT variance can be minimised by maintaining the ATO system as a true Push-Pull hybrid state with sufficient CODP stock, although increased operational cost driven by bullwhip and CODP variance need to be considered. However, if the hybrid ATO system 'switches' to the pure Push state, the mean and variance of delivery LT can be significantly increased.
Item Type: | Article |
---|---|
DOI/Identification number: | 10.1016/j.ijpe.2019.107531 |
Uncontrolled keywords: | System dynamics, Nonlinear Control theory, Trade-off analysis, Minimum Reasonable Capacity, Minimum Reasonable Lead-time |
Divisions: | Divisions > Kent Business School - Division > Department of Analytics, Operations and Systems |
Depositing User: | Virginia Spiegler |
Date Deposited: | 24 Oct 2019 10:32 UTC |
Last Modified: | 05 Nov 2024 12:42 UTC |
Resource URI: | https://kar.kent.ac.uk/id/eprint/77778 (The current URI for this page, for reference purposes) |
- Link to SensusAccess
- Export to:
- RefWorks
- EPrints3 XML
- BibTeX
- CSV
- Depositors only (login required):