Cardellicchio, Luciano (2018) A new methodology for reconstructing the building process. The case study of the new Hertziana library in Rome. In: Construction History Society - Conference Proceedings 2017. Cambridge Press. (In press) (KAR id:66489)
This is the latest version of this item.
PDF
Author's Accepted Manuscript
Language: English |
|
Download (186kB)
Preview
|
Preview |
This file may not be suitable for users of assistive technology.
Request an accessible format
|
Abstract
Between 2003 and 2012, the New Bibliotheca Hertziana (Max-Planck Institute for the Art History) was built on the site of the garden of Federico Zuccari's sixteenth-century house in the historic urban fabric of Rome. The project aimed to demolish a 1960s building in the centre of Rome keeping its facades and constructing between them a more efficient, safer and more spacious building. The non-standard development of this conservation project led to the invention of several bespoke technical solutions and advanced conservation procedures. This innovative and bold construction process was developed by a pioneering engineering approach. The outcome of this experimental case study extends the building itself, having an impact on new developments in historical environments constrained by archaeological remains.
Despite the foreign origin of the architect, the structural development of this building was entirely carried on by Italian engineers who relied on the ability of crafting the construction process as a unique case study. The structural engineers involved in this project were: Alberto Parducci, Alfredo Marimpietri, Marco Mezzi e Sergio Oliviero. Despite the ambition of the project, they were able to collaborate with the architect at the ‘technical design development’ stage, delivering a complete new structural design without interfering with the aesthetics of the scheme, which remained untouched.
This paper aims to retrospectively discuss the contribution of the structural engineers in delivering this challenging conservation project in central Rome, analysing how the new structural systems was developed, and how it was built. The ultimate aim is to disseminate an untold story, which can unlock the potential impact of this case study for similar constructions.
Item Type: | Book section |
---|---|
Uncontrolled keywords: | Hertziana, Baldeweg, conservation, structure, engineering |
Subjects: |
N Visual Arts > NA Architecture T Technology > TH Building construction |
Divisions: | Divisions > Division of Arts and Humanities > Kent School of Architecture and Planning |
Depositing User: | Luciano Cardellicchio |
Date Deposited: | 20 Mar 2018 20:33 UTC |
Last Modified: | 16 Feb 2021 13:53 UTC |
Resource URI: | https://kar.kent.ac.uk/id/eprint/66489 (The current URI for this page, for reference purposes) |
Cardellicchio, Luciano: | ![]() |
Available versions of this item
-
A new methodology for reconstructing the building process. The case study of the new Hertziana library in Rome. (deposited 11 Dec 2017 17:03)
-
A new methodology for reconstructing the building process. The case study of the new Hertziana library in Rome. (deposited 20 Mar 2018 20:26)
- A new methodology for reconstructing the building process. The case study of the new Hertziana library in Rome. (deposited 20 Mar 2018 20:33) [Currently Displayed]
-
A new methodology for reconstructing the building process. The case study of the new Hertziana library in Rome. (deposited 20 Mar 2018 20:26)
- Export to:
- RefWorks
- EPrints3 XML
- BibTeX
- CSV
- Depositors only (login required):